Current Projects
Current projects at Rocksure International Limited


01. Edikan
Perseus Mining Ghana Limited
Project Start: February 2019
Workforce- 413 Workers
Scope of Project: Load & Haul, Production Drilling & Blasting, RC Drilling HeapLeach, Tailings and Crushed Ore Stockpile Management​​
​
Annual production: 12 Million bcm
​​
Equipment List
2x Komatsu PC2000 Excavators
4x Komatsu PC1250 Excavators
41x 100T Komatsu 785-7 Trucks
6x Komatsu D275A Dozers
1x Komatsu 375 Dozer
3x Komatsu GD 825 Grader
10x Sandvik Pantera DP 1500i Drill Rigs
1x Epiroc RC Rig
2x Komatsu WA900 Pay Loaders
1x Sleipner E190

02. Bibiani Gold Mine
Asante Gold Corporation
Start Date: February 2025
Workforce: 57 workers.
Scope of Project: Equipment Rental
​​​
​

03. Asanko Gold Mine
Asanko Gold Ghana Ltd. (NKRAN)
Project Start: February 2025
Workforce: 102 workers
Scope of Project: Load & Haul, Drill & Blast
​
Equipment List
10x Komatsu HD 785 Trucks
2x Komatsu PC2000 Excavator
2x CAT D9GC Dozers
1x CAT 16GC Grader
1x Liebherr 1090 Crane
1x Liebherr 776 Dozer
2x Sandvik Pantera DP 1500i Drill Rigs
​
04. Joint Venture
Underground Mining Alliance Limited
UMA (underground Mining Alliance) is an underground mining services contractor . It is a joint venture between Rocksure International Limited and African Underground Mining Services (AUMS) which is a subsidiary of Perenti group of companies. UMA is currently working for Anglogold Ashanti Mine at Obuasi and Newmont Mine doing the Ahafo South underground project normally referred to as the Subika project.
Scope of Project
-
Mining Development
-
Mining Production
-
Mining Services
-
Mobile Maintenance
-
Electrical and Communications
-
Fixed Plant Maintenance
-
Project and Operations Management
-
Short time Technical and Mine Operations
-
Engineering
-
Management Reporting Controls.
Project Start: February 2019